The building is an eight story project that can accommodate a total of 600 employees.

The design features long volumes stacked to create cantilevered sections that shade large parts of the façade. White polycarbonate panels with triangular perforations will be used to reflect light, which would be placed in between the layers of glass of the façade.

With the building’s design now complete, the construction is slated to begin in January 2011.