The 330,000 square meter government complex features eight towers. Four of the towers are connected by a four-story concourse building.

Previously, various government departments of Barcelona were housed in seventeen buildings scattered across the city. The new conjoined City of Justice is designed to improve efficiency, and the spaces have been designed to be flexible to adapt and absorb the constant transformation of the judicial body. The design has integrated space which is reserved for any future growth.

The complex houses Barcelona’s courts, public functions, office spaces and cells. The ground floor of one of the blocks features retail and restaurant spaces. Another block which is under construction is a residential and apartment building.

The irregular placement and spatial compositions of the individual buildings breaks the bulk of the project, and establishes a balance between different volumes, spaces and heights.

Each block has been constructed with in-situ concrete façade with a different pigmentation. The first of the buildings was completed in September 2007.