The renovation will preserve and restore the landmark 1923 building’s historic features while modernizing and upgrading the facility to create a world-class cultural center.

The renovation was designed in two phases. Phase I of the project addressed behind-the-scenes improvements. These included installation of a new, state-of-the-art sprung stage floor, new elevator shaft, modernized dressing rooms and backstage areas.

City Center’s interior features elaborate arabesque ceilings and detailed plasterwork. The architects chalked out a design plan that would preserve the center’s essential character and at the same time accentuate the building with modern patron amenities. Visitors will be welcomed with an illuminated marquee on 55th Street. The auditorium’s walls will be painted in rich colours to highlight the original decorative detail. The new design elements will incorporate the center’s underlying motifs of Islamic architecture.

The original box office and mezzanine lobbies of the theatre will be restored. Also, several new spaces will be introduced such as an expanded and redesigned street level lobby, a new patrons’ lounge, new bars and increased and revamped restrooms. The existing elevator will be upgraded and a new one will also be added. The auditorium will be revamped to improve sightlines and be made handicap-accessible. Wider seats with expanded legroom will be added. There will also be a new illuminated glass-and-bronze canopy. The total seats in the auditorium will be reduced to 2,235 from the current 2,753.

The $75 million Campaign for City Center called Preserving the Past, Securing the Future will be used to renovate the landmark building as well as support City Center’s current and future programs such as the Encores! Great American Musicals in Concert series and the Fall for Dance Festival.

The city of New York has committed more than $35.6 million to the capital campaign. Funds have also come from the Office of the Mayor through the Department of Cultural Affairs, the New York City Council and the Office of the Manhattan Borough President. A gala re-opening is scheduled for 25 October 2011.

The performing arts complex includes a 2,753-seat main stage, two smaller theaters, four studios and a 12-storey office tower. It is home to Alvin Ailey American Dance Theater, Paul Taylor Dance Company and Manhattan Theater Club.