The refurbishment has been designed to make the historic building energy-efficient. Bringing the building to contemporary standards, the original façade of the building was retained. The original 25m pool has been retiled along with the learner pool, with new changing areas installed. Care was taken to protect the heritage of the building. Other new enhancements included the provision of a remodelled entrance area, reception and café.
Other improvements include an expanded gym and fitness area, dry side changing rooms, restored Warwick Hall multi-purpose studio, and a new youth facility. These are due to be completed by mid 2011.
A major aspect of the renovation was the energy efficient features to reduce the carbon footprint of the building: low energy plant, equipment and fittings, low energy lighting, and materials specified from “A” rating of the Green Guide Specification.
The centre originally opened on 1 October 1892. It has been managed by Fusion Lifestyle for over 10 years. The project was completed on behalf of Southwark Council.
Photo credit: David Mackenzie