The sports hall (16m x 32m) is earth retaining to three walls and the previous waterproofing to the wall/floor joint and floor had failed.
Triton’s Aquachannel drainage conduit with integral inspection ports was installed around the perimeter walls, the lower sections of the walls were sealed with liquid applied TT Vapour Membrane before the installation of Platon P8 cavity drain membrane. This cavity drain membrane system drains to external gravity drains at the front of the building.