The school now features an expanded space. Renovation which occurred in two phases have added a stage, orchestra room, art room, music room, updated cafeteria, additional classrooms, guidance area and a media center. The renovation has also added additional space to the school’s library and doubled the size of 5700-square foot gymnasium. The school’s old gymnasium accommodated 400 students.
Funds for this renovation-cum-expansion project came from a combined $6.2 million operating and permanent improvement levy, which was passed in November 2007.